1/1/2024 0 Comments Bay bridge traffic updates![]() Highway 49 traffic on the Bay of Quinte Skyway will be reduced to a single-lane for each year of construction. The work in 2024 will include the installation of expansion joints, final paving and the restoration of the site. ![]() Please follow the advisory signage and markers.Ĭonstruction started in the summer of 2018 and is anticipated to be completed in the summer of 2024. As a result, this will necessitate some changes to the navigation channels under the bridge. To complete the work over water, it is anticipated that the contractor will use cranes on barges to remove the existing structural steel girders and erect new ones. Within each segment, the bridge will be replaced on a half and half basis with single-lane traffic controlled by temporary traffic signals. A single segment of the bridge will be replaced in each of the subsequent five (5) years. The first year, 2018, will be for preparation, mobilization and advance work. The work will be staged over several years. The bridge deck will be widened slightly and will include 1.5 m shoulders on each side. The work will include the complete replacement of the steel girders and deck, rehabilitation of the piers, and reconstruction of the abutments. The bridge was constructed circa 1967 and is in need of major repairs. The Bay of Quinte Skyway Bridge is an 850 m long, high-level bridge carrying two lanes of Highway 49 traffic over the Bay of Quinte. Temporary Traffic Signals will be in place to control vehicular traffic over the Skyway Bridge. The Skyway Bridge will be reduced to single lane traffic until late December 2023.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |